SDRC 1

17 October 2017
SDRC 1 – Specification Design & Testing.

Download the PDF

Annexes
A1 – OpenLV Requirements Specification
A2 – OpenLV Solution Factory Acceptance Test Documentation
A3 – OpenLV Solution Site Acceptance Testing Schedule


SDRC 2

Part 1

8 December 2017
Community Engagement Plan & Testing the Market

Download the PDF

Annexes
A1 – CSE Report 1 Establish The Market
A2 – Regen Deliverable 1 Market Assessment Report v.2.1
A3 – CSE Report 2 Community Engagement Plan V2.0
A4 – OpenLV Method 3 Establishing the Market Report

Part 2

25 May 2018
Target Networks, Market Potential & Detailed Trial Design

Download the PDF

Annexes
A1 – Loadsense Operational Logic
A2 – OpenLV Community Engagement Trial Participant MoU
A3 – OpenLV Business Academia Trial Participant MoU


SDRC 3

31 January 2019
Learning from Deployment & App Development

Download the PDF

Annexes
A1 – OpenLV Identification of Trial Networks
A2 – Site Survey Guidance
A3 – Site Survey Checklist
A4 – OpenLV Site Survey Locations
A5 – Appendix 1 – Chapel Street Bere Alston (330326) & Pilgrim Drive (331615)
A5 – Appendix 2 – Cosira Sleaford (912548) & East Road Sleaford (912807)
A5 – Appendix 3 – Canefields Ave (332853) & Lotherton Close (332770)
A5 – Appendix 4 – Mariette Way (911747) & Wygate Park (911748)
A5 – Appendix 5 – R.A.V.C. (910065) & St Bartholomews Way (910066)
A5 – Fault Current and Protection Studies for Alvin Installations
A6 – Method Statement – LVCap
A6 – Appendix A – LUCY40119-Gridkey-LV-Monitoring-Guide
A6 – Appendix B – 109250-001
A6 – Appendix C – OpenLV Solution Site Acceptance Testing Schedule v1.1
A6 – Appendix D – Method Statement – Alvin Reclose v1.0
A6 – Appendix E – Method Statement – DirectCoupled Door Replacement v1.1
A7 – Alvin Reclose – Blank Commissioning Documents
A8 – Fault Restoration Notices
A9 – Alvin Installation Training
A10 – OpenLV Requirements Specification
A11 – OpenLV Factory Acceptance Tests
A12 – Post-FAT Stage 2 – Loadsense Analysis
A13 – OpenLV Site Acceptance Tests
A14 – OpenLV Business and Academia Trials – Guidance for Applicants
A15 – OpenLV Third Party Application Information Form
A16 – OpenLV Third Party Supporting Test Document
A17 – OpenLV Third Party Test Results Document
A18 – Feedback on Standard Guidelines for Application Development
A19 – LV-CAP Node-RED Application Developer Guide
A20 – Developing with the LV-CAP Virtual Machine
A22 – OpenLV Measurement points
A23 – GridKey OpenLV Data Centre System Overview


SDRC 4

Method 1

31 January 2020
Learning Generated from the OpenLV Method 1 Trials

Download the PDF

Annexes
A1 – Fault Current and Protection Studies for Alvin Installation
A2 – OpenLV Solution Factory Acceptance Test Stage 2 Documentation
A3 – Post-FAT Loadsense Analysis v1.0
A4 – OpenLV Measurement Points
A5 – Thermal Monitoring & Thermodynamic Modelling of Distribution Transformers

Method 2

31 January 2020
Learning Generated from the OpenLV Method 2 Trials

Download the PDF

Annexes
A6 – Learning Gained Engaging with Community Groups
A7 – Value & Benefits
A8 – Regen – Mid-Trial Report 1
A9 – Regen – Mid-Trial Report 2
A10 – Regen – Mid-Trial Report 3

Method 3

31 January 2020
Learning Generated from the OpenLV Method 3 Trials

Download the PDF


SDRC 5

27 April 2020
Knowledge Capture, Dissemination and Transferring the OpenLV Solution to BAU

Download the PDF

Annexes
A1 – Method Statement
A1.1 – GridKey MCU520 LV Monitoring System Guide
A1.2 – Installation Schematic Drawings 109250-001 SHT 1 & 2
A1.3 – Site Acceptance Testing & Commissioning
A1.4 – ALVIN Reclose Installation & Commissioning
A1.5 – Replacement of LV Enclosure Door
A1.6 – ALVIN Reclose Decommissioning
A2 – ALVIN Reclose Overview Presentation
A3 – ALVIN Reclose Quick Installation and Removal Guide
A4 – Restoration Notices For OpenLV ALVIN Reclose Deployment
A5 – User Guide for Community Groups
A6 – OpenLV Measurement Points
A7 – LV Common Application Platform Public API
A8 – Developing for LV-CAP using the Virtual Machine
A9 – Community Guide Book
A10 – OpenLV Security Assurance Letter
A11 – OpenLV Security Assurance Review (access requests to wpdinnovation@westernpower.co.uk)
A14 – Technical Security Standard