SDRC 1

27 October 2017

Specification, Design and Factory Testing of the overall OpenLV Solution.

Download the PDF


SDRC 2 (part one)

31 December 2017

Part One: Method 2 Community Engagement Plan and sharing the results from assessing the market potential for sharing LV network data with and providing an open platform to communities that want to be part of a smarter grid.

Method 3 Sharing the results from assessing the market potential for sharing LV network data with and providing an open platform to academics and companies (including non-energy companies).

Download the PDF


SDRC 2 (part two)

30 May 2018

Part Two: Identification of Target Networks (Method 1), Community Engagement Plan, Assessment of the Market Potential (Methods 2 & 3) and Detailed Trial Design for all Methods.

Download the PDF


SDRC 3

1 February 2019

Learning from Deployment of the Overall OpenLV Solution & Standard Guidelines for Application Development.

Download the PDF


SDRC 4

31 January 2020

Learning Generated from the OpenLV Project Trials for All Methods.

Method 1

Download the PDF

Appendix
Fault Current and Protection Studies for Alvin Installation
OpenLV Solution Factory Acceptance Test Stage 2
Post-FAT Loadsense Analysis v1.0
OpenLV Measurement Points
Thermal Monitoring & Thermodynamic Modelling of Distribution Transformers

Method 2

Download the PDF

Appendix
Learning Gained Engaging with Community Groups
Value & Benefits
Regen – Mid-Trial Report 1
Regen – Mid-Trial Report 2
Regen – Mid-Trial Report 3

Method 3

Download the PDF


SDRC 5

30 April 2020

Knowledge Capture, Dissemination & Transferring the OpenLV Solution to Business as Usual.